Refresh 2024
Infinity Construction was contacted by our client to re-imagine and update their Kitchen and Adjacent Rooms. We contacted our Kitchen designer and with our clients in tow set forth on developing a new Kitchen and sprucing up Adjacent Rooms. Along the way we tended to several items on a repair basis we found during our work on this 35 plus year old home. The new Kitchen’s central design point was removal of the current old-style Panty with a door and replacement with more Cabinetry and Counter space. We incorporated a large Eat-in Island and new Appliances throughout. One aspect that aided in space utilization was reimagining the Mudroom. With new Pantry style Cabinetry, we were able to up the total storage area and more than offset the loss of the traditional Pantry. Our work in the Kitchen highlighted a new Thermador Range and Hood with a magnificent backsplash featuring a focal point that would capture any eye entering the room. The use of a drawer-based Microwave aided in making the function of this Kitchen come tighter seamlessly. One of the major hurdles was installing the new hood and the fresh air return ducting required in today’s specifications. Floor trusses, space limiting cavities, plumbing lines, and electrical wires greatly complicated this process. We worked tirelessly with our HVAC subcontractor to develop a route for ducting that met the specifications of local authorities and the manufacturers.
While designing the Kitchen we decided to replace the flooring on 90 percent of the Main Level, retrim the Base, Cased Openings, Door trim, Shoe Mold and Repaint the level throughout. The Kitchen as well as other areas received new Lighting Fixtures, Plumbing upgrades and we installed a new Gas line to the house to facilitate the elegant new Gas Range. We worked closely with our client and designer to achieve the magnificent outcome our client has hoped for. Most impressively Infinity Construction was able to complete the project on time and considerably under budget.

